王志雄

5 職稱: 教授
學歷: 國立台灣科技大學工業管理博士
研究領域: 檢驗策略,EMQ模型
Office:教學一館北棟218室
Phone:(08)766-3800 #31668
E-mail:chwang@mail.nptu.edu.tw
學術研究與經歷成果

一、期刊論文

  1. Neng-Hui Shih, W. C. Tsai, Chih-Hsiung Wang*. An Integrated Production and Inspection Model With a Heuristic Product Inspection Policy When Inspection Errors Exist, Universal Journal of Operations and Management, Volume 2 Issue 1, 2023. 本人為通訊作者
  2. W. C. Tsai & Chih–Hsiung Wang. Optimal production lot size under backup agreement allowing substitute products, RAIRO - Operations Research, 54(2020), p.1309–p.1326. 本人為通訊作者
  3. N. H. Shih & Chih–Hsiung Wang (2018). The effect of full or partial pricing integration on supply chain management, RAIRO - Operations Research, 53(5), p.1807-p.1817. 本人為通訊作者
  4. N. H. Shih & Y. S. Liao & Chih–Hsiung Wang (2018). Determining an economic production quantity under a zero defects policy, Journal of the Operational Research Society, 69(8), p.1309-p.1317. 本人為通訊作者
  5. W. C. Tsai & N. H. Shih & Chih–Hsiung Wang (2018). The effects of inspection delay and restoration cost on the optimal inspection and production policy, OPSEARCH, 55(1), p.187-p.195. 本人為通訊作者
  6. W. C. Tsai & Chih–Hsiung Wang (2017). Extended economic maintenance scheduling for a batch production system, Journal of Information and Optimization Sciences, 38(2), p.219-p.231. 本人為通訊作者
  7. N. H. Shih & Chih-Hsiung Wang (2016). Determining an optimal production run length with an extended quality control policy for an imperfect process, Applied Mathematical Modelling, 40(4), p.2827-p.2836. 本人為通訊作者
  8. Neng-Hui Shih, Chih-Hsiung Wang (2014, Mar). An inspection model of products and their input materials, Systems Science and Control Engineering An Open Access Journal. NSC 100-2410-H-251-007. 本人為通訊作者.
  9. Neng-Hui Shih and Chih-Hsiung Wang (2013, Dec). An extended production and inspection model with non-rigid demand, The Scientific World Journal, vol. 2013, Article ID 623075, 7 pages, 2013. NSC 101-2410-H-251-004. 本人為通訊作者.
  10. Chih–Hsiung Wang*, W. C. Tsai (2012, Nov). Determining the production lot size with a heuristic inspection policy for controlling the quality of input materials and products, International Journal of Systems Science, 43(11), 2030-2039. (SCI). 本人為第一作者、通訊作者.
  11. Chih-Hsiung Wang*, Neng-Hui Shih & W. C. Tsai (2011, Dec). Utilizing the information theory of entropy to solve an off-line inspection problem, A Quarterly Journal of Operations Research, 9(4), pp. 391-401. (SCI). 本人為第一作者、通訊作者.
  12. W. C. Tsai, Chih-Hsiung Wang* (2011, Oct). Economic optimization for an offline inspection, disposition and rework model, Computers & Industrial Engineering, vol. 61, pp. 891-896. (SCI). 本人為通訊作者.
  13. Chih–Hsiung Wang*, Tadashi Dohi, W. C. Tsai (2010, Oct). Coordinated procurement/inspection and production model under inspection errors, Computers & Industrial Engineering, Volume 59 Issue 3, pp.473-478. (SCI). NSC 98-2410-H-251-007. 本人為第一作者、通訊作者.
  14. W. C. Tsai*, Chih–Hsiung Wang (2010, Oct). Modeling the effect of order timing reduction on coordinating supply chain inventories using a selective discount strategy, The Operations Research Society of Japan, 53(4), pp. 255–269. (SCI).
  15. W. C. Tsai*, Chih–Hsiung Wang (2010, Sep). Decision making of sourcing and order allocation with price discounts, Journal of Manufacturing Systems, 29(1), pp. 47-54. (SCI).
  16. Chih–Hsiung Wang (2010, May). Some remarks on an optimal order quantity and reorder point when supply and demand are uncertain, Computers & Industrial Engineering, Volume 58, Issue 4, Pages 809–813. (SCI). 本人為第一作者、通訊作者.

二、學術研究

  1. 王志雄,2016/08-2017/07,製造商於備用訂購契約下的最佳生產批量,計畫編號:MOST104-2410-H153-002-MY2,擔任職位:計畫主持人
  2. 王志雄,2014/08-2015/07,零瑕疵品策略下的經濟生產與檢驗計畫,計畫編號:MOST103-2410-H153-026,擔任職位:計畫主持人
  3. 王志雄,2013/08-2014/07,系統遭受衝擊而當機時的最佳生產批量,計畫編號:MSC102-2410-H251-005,擔任職位:計畫主持人
  4. 王志雄,2011/08-2012/07,退化性生產系統之最佳生產批量以及其原物料和產品的檢驗策略,計畫編號:NSC100-2410-H-251-007,擔任職位:計畫主持人
  5. 王志雄,檢驗、重工與殘處理計畫以及生產計畫之整合,計畫編號:99-2410-H-251-013
  6. 王志雄,型I與型II檢驗誤差下整合採購、檢驗與生產計畫,國科會研究計畫,計畫編號:NSC 98–2410–H–251–007